Raw land, no well, no septic. Electric poles nearby. Approximately 48 trees have been cleared. A 20 foot drain pipe has been installed at the beginning of the driveway for a construction entrance. The area has been cleared for a house, septic and driveway. A perc test and deep hole test has been done. Engineering plans have already been done for a home and septic but not for a well. Basically all the leg work has been done. Engineered site plan, survey and proposal for home in hand according to residential building code for the municipality. Owner discloses interest. Additional Information: SoilType:Clay,Loam,
Copyright © 2024 OneKey MLS. All rights reserved. All information provided by the listing agent/broker is deemed reliable but is not guaranteed and should be independently verified.